Hey there!
It's been a long-awaited delivery, but here are some pictures of the construction of the new English classroom/library! I'll make this post all about construction and the next all about the final product, only because I can't upload more than 5 pictures per post!
The construction took a total of about two months, and then about another month to get all of the books and DVDs in. As I speak there are some 4th grade students enjoying, "Horton Hears a Who" in the theatre. :)
So here's the pics, along with some captions! Enjoy!
A wall that had separated two rooms was partially demolished to turn the two rooms into one larger space.
This is what would become the main teaching space with a blackboard, tv and side whiteboard.
This is the same area, only a few weeks later, after the main part of the construction had finished and the decorating had begun.
This is the theatre that has a small stage for role-plays as well as a tv for English movies. It also has graded seating that the students typically treat like a jungle gym.
This was taken while standing at the back of the classroom and looking into the library. The man pointing is the head of the project from a design company and the woman in the skirt is my co-teacher, Nam Seona.
No comments:
Post a Comment